Menu

Smart Mobility Projects

The GB2S has participated in numerous Research Projects related to Smart Mobility both at the state and European level

IN ITINERE

Integrated, Extended, Relevant and Efficient Traffic Identification Information.


Reference: RTC-2016-5177-4
Participants: UPM and 1 Enterprise (Coord.: SICE, SA)
Duration: Septiembre 2016 - Abril 2019
Financed by: Ministerio de Economía y Competitividad (programa Retos-Colaboración 2016)
ALL-IN-ONE

Integrated traffic monitoring platform, low cost and extended information.


Reference: RTC-2016-5479-4
Participants: UPM and 3 Enterprises (Coord.: ACEINSA Movilidad, SA)
Duration: Septiembre 2016 - Febrero 2019
Financed by: Ministerio de Economía y Competitividad (programa Retos-Colaboración 2016)
IMPORTAES

Passenger Multitechnology Identification for the Optimization of Bus Transportation Routes and Service Efficiency.


Reference: RTC-2016-4828-4
Participants: UPM and 1 Enterprise (Coord.: SICE, SA)
Duration: Septiembre 2016 - Febrero 2019
Financed by: Ministerio de Economía y Competitividad (programa Retos-Colaboración 2016)
FLOW

Business analytics platform based on monitoring and modeling the flow of people in large areas.


Participants: UPM and 1 Enterprise (Coord.: Landatel, SL)
Duration: Noviembre 2015 - Marzo 2018
Financed by: CDTI (Centro para el Desarrollo Tecnológico Industrial)
GESTTOR

Catalog of products for traffic management based on measurements of real and objective stretch times.


Reference: RTC-2014-1473-4
Participants: UPM and 2 Enterprises (Coord.: SICE, SA)
Duration: Octubre 2014 - Diciembre 2016
Financed by: Ministerio de Economía y Competitividad (programa Retos-Colaboración 2014)
PLASMA

Platform for Advanced Mobility Services.


Reference: RTC-2014-2158-4
Participants: UPM and 1 Enterprise (Coord.: SICE, SA)
Duration: Octubre 2014 - Diciembre 2016
Financed by: Ministerio de Economía y Competitividad (programa Retos-Colaboración 2014)
S4BIM

Sensorization system for construction monitoring using BIM services.


Reference: RTC-2014-2040-7
Participants: UPM and 1 Enterprise (Coord.: Dragados)
Duration: Diciembre 2014 - Diciembre 2017
Financed by: Ministerio de Economía y Competitividad (programa Retos-Colaboración 2014)
TRAIECTO

Travel Times through Wireless Acquisition and Estimation of Traffic Conditions for Optimization.


Reference: IPT-2012-0537-370000
Participants: UPM and 1 Enterprise (Coord.: SICE, SA)
Duration: Mayo 2012 - Diciembre 2015
Financed by: CDTI (Centro para el Desarrollo Tecnológico Industrial - Programa INNPACTO)
INTELCITY

Integral Platform of Smart Cities.


Reference: IBK 10-667
Participants: UPM, 1 University, 2 Enterprises and 2 Instituciones de la Administración local (Coord.: ABACCUS Soluciones e Innovación, SA)
Duration: Octubre 2011 - Septiembre 2013
Financed by: CDTI (Centro para el Desarrollo Tecnológico Industrial - Programa IBEROEKA)
PRADO

Intregral Project in Domotics.


Reference: PCT-G288226055-200 / PCT-G28826055-2006 / PCT-G28826055-2005 / PCT-Q2818015F-04
Participants: UPM
Duration: Enero 2004 - Diciembre 2007
Financed by: Ministerio de Ciencia y Tecnología
INAUDITO

Advanced user interfaces in domotic and inmotic environments.


Reference: TIC2003-09192-C11-07
Participants: UPM and 4 Universities
Duration: Diciembre 2003 - Noviembre 2004
Financed by: Comisión Interministerial de Ciencia y Tecnología (Plan Nacional de I + D)
PRADO

Intregral Project in Domotics.


Reference: PCT-200200-2003-49 / PU-2002-33
Participants: UPM
Duration: Diciembre 2002 - Enero 2002
Financed by: Ministerio de Ciencia y Tecnología